Strathfield Private Hospital – Operating Theatre & Recovery

Winner excellence in construction 2014

WINNER 2014

MBA Excellence in Construction

Health Buildings $5,000,001 – $10,000,000

This project involved the design and construction of a new level 2 operating theatre suite to the existing facility. The works were constructed above the existing level 1 ward and included a new Hybrid Theatre complete with Siemens robot and Stryker pendants.

The works also included a 12 bed recovery ward, 2 anaesthetic preparation bays, new staff lounge facilities, wash bays, cleaners utility room and pharmacy.

The works required a high level of WHS practices due to the sensitive nature of the works and that they were being undertaken within the existing facility.

In addition to the main building works, the project also included the installation of a new patient lift, the provision of a 500kva emergency generator and new electrical kiosk substation.

The initial construction phase of the structural steel support frame, concrete slab & main building framing was undertaken within 17 weeks without any disruption to the operational use of the hospital.