ST JOSEPH’S COLLEGE LIFT

This Project involves new construction work to Mary Street Lift and access upgade required for Stage 1 works.

The works will include the demolition of existing retaining walls, concrete stairs, balustrade and concret dish drains/stormwater pits. Bulk and detailed excavation required for footings and new lift pit. New electrical, hydraulic and fire services works requried. A new lift shaft in blockwork and insitu walls with walling, cladding and linings to lift shaft. Internal cement render to lift shaft walls with aluminium window frame suite. New lift to be installed with minor external concrete paths, stairs, retaining walls and landscaping

Approx. Value $882,057