This Project involved new construction work to Mary Street Lift and access upgrade required for Stages 1 & 2 works.

The Stage 1 works included:

• The demolition of existing retaining walls, concrete stairs, balustrade and concrete dish drains/stormwater pits.

• Bulk and detailed excavation required for footings and new lift pit.

• New electrical, hydraulic and fire services works required.

• A new lift shaft in blockwork and insitu walls with walling, cladding and linings to lift shaft. Internal cement render to lift shaft walls with aluminium window frame suite.

• New lift to be installed with minor external concrete paths, stairs, retaining walls and landscaping

The Stage 2 works included:

• The demolition, earthworks and excavation of existing concrete access walkway.

• New hydraulic and electrical services.

• New concrete paths, stairs, sandstone clad retaining walls and handrails.

The columns were completely removed so that all the pad footings could be fixed. The Columns were reinstated once the pad footings were completed.

Finished Photos

SJC Mary Street Columns Re Installation

SJC Mary Street Columns Removal

Level 1, 9-13 Underwood Avenue,
Botany NSW 2019

PO Box 659 Botany
NSW 1455 Australia

Phone: + 61 2 9289 3700
Fax: + 61 2 9289 3730

Get In Touch