Whether it’s a full construction or a staged refurbishment, we have extensive KNOW HOW when it comes to this busy sector. We are known in the industry for our ability to undertake hospitality projects and create amazing spaces, in and around operational environments. With a string of industry awards to our credit, we are highly familiar with consumer trends, government regulations and the critical commercial needs of our hospitality and entertainment clients.

Union Hotel, Newtown

This project involved a full renovation and upgrade of the existing gaming room.

Read more

Uncle Bucks Tavern

This project involved the complete refurbishment of the existing hotel. The works included an extension with new outdoor gaming room and floating Chinese Dragon.

Read more

The Royal Hotel, Ryde

The Royal Hotel, Ryde consisted of a multi-stage construction program that ensured the hotel maintained food, drink and gaming services.

Read more

The Royal Hotel Leichhardt

This project saw Fugen create a new Level 1 bar and balcony space for the hotel, whilst refurbishing the ground floor bar.

Read more

The Royal Hotel

This project was our third for the Pub Funds Investment Group. The project was delivered in three stages to allow the hotel to remain operational through all works.

Read more

The Republic Hotel

This project consisted of the staged refurbishment to all 3 levels of the hotel, including the creation of a new Roof Top Bar, whilst the hotel was able to maintain daily operations.

Read more

The Prince Hotel

This project involved the complete construction of the The Prince Hotel, Kirrawee.

Read more

The Paragon Hotel

This project involves the renovation and conversion of Level 1 of The Paragon Hotel into a Rooftop Bar.

Read more

The Commodore Hotel

This project involved the design and refurbishment to the existing hotel over five stages whilst the hotel remained fully operational. Works consisted of the full refurbishment of the hotels trading areas

Read more

The Chelsea Hotel

The Chelsea Hotel was completed in 2 stages. The project consisted of some minor extensions to the existing hotel as well as the major refurbishment of the outdoor areas.

Read more

Surry Hills Hotel

Refurbishment upgrade to existing Outdoor Garden & Games Room

Read more

Stonecutters Ridge Golf Club

Stonecutters Ridge development involved the design and construction of three new buildings; Stonecutters Ridge Golf Club, Neighbourhood Centre & Maintenance Shed.

Read more

Orient Hotel

The project involved upgrading the bathrooms and transforming the Atrium into an open roof area.

Read more

North Annandale Hotel

This project consisted of the reconfiguration of the internal & external gaming areas which incorporated a new light well with fixed glazing and auto louvres separating the indoor and outdoor gaming.

Read more

New Brighton Hotel

This project involved the removal and strip out of the entire internal structure while retaining the façade and the heritage listed elements. The façade was temporarily supported with structural steel elements.

Read more

Maroubra Seals – First Floor Bistro

This is our second project for the Maroubra Seals Club. The works consisted of the demolition of the existing kitchen.

Read more

Covent Garden Hotel

This project saw the total refurbishment of the building. It included major structural works as well as works to a larger basement. Detailed work was undertaken to the façade and main bar.

Read more

Campbelltown Golf Club

The works included the refurbishment and extension of the proshop, bathroom facility, including locker room and the construction of a new outdoor gaming terrace with hard and soft landscaping.

Read more

Campbelltown Catholic Club

This project involved the major internal refurbishment and upgrade to the existing club. In order for the club to maintain operations, the works were carried out over five stages.

Read more

Maroubra Seals Club

Fugen are completing a refurbishment to the existing gaming room at Maroubra Seals Club.

Read more

Agincourt Hotel

Fugen were engaged to carry out works to construct a new Gaming Room at the Agincourt Hotel. The works were carried out outside of normal working hours to minimise disruption to the existing Gaming Room and Bar.

Read more

Market City Tavern

The Market City Tavern project involves the stripping out and refurbishment of the existing Level 1 Bar, Tab Area, Bathrooms and Dining Section.

Read more

Angelo’s Cabarita

Complete transformation of the existing Dining room, Kitchen and Bar.

Read more

Taren Point Hotel

The Taren Point Hotel project consists of a full refurbishment of the venue including a 3 staged construction program while maintaining the hotels operation of food, beverage and gaming.

Read more

Rose Bay Hotel

This refurbishment includes the complete strip out of the existing ground floor hotel.