Fugen Constructions was engaged in a DESIGN & CONSTRUCT capacity to provide a purpose-built pedestrian accessway improving accessibility through the Prince of Wales Hospital to the hospital’s new Acute Services Building along with End of Trip (EOT) facilities. The EOT facilities include new change rooms, amenities, 200 bicycle storage spaces and 80 lockers located within the existing level B3 carpark. The IASB Public Linkway works included modifications and additions to the existing Royal Hospital for Women floor area that improved the pedestrian travel path to the new ASB building.
Our Location
Level 1, 9-13 Underwood Avenue
Botany NSW 2019
PO Box 659 Botany
NSW 1455 Australia
Phone: 02 9289 3700