Fugen Constructions were engaged to upgrade the St Joseph’s College Mary Street lift and access point across two stages. Stage 1 included the construction of a new lift shaft in blockwork within an existing school building. Stage 2 involved the full refurbishment of an existing concrete access walkway.
Each week, you can visit this page to watch the latest progress video as construction advances on your project.