Strathfield Private Hospital – Operating Theatre & Recovery (Design and Construct)

Winner excellence in construction 2014

WINNER 2014

MBA Excellence in Construction

Health Buildings $5,000,001 – $10,000,000

PROJECT OVERVIEW: Fugen Constructions was engaged across 3 stages to DESIGN and CONSTRUCT a new purpose-built level 2 operating theatre and recovery suite immediately above the existing level 1 east ward facilities. On completion, the new areas consisted of a hybrid operating theatre and control room, multi-purpose operating theatre, 12 bed recovery ward, 2 x anaesthetic preparation rooms, theatre wash/ scrub bay, general staff lounge, pharmacy, cleaners and utility rooms, patient lift and air lock lobby.

Project Overview

Download Case Study Photo Gallery